
GMMA-60L Automatic Plate Beveling Machine, 0–90° Bevel Angle
- Plate thickness
- 6–60 mm
- Bevel angle
- 0–90°
- Power
- 3,400 W
Milling head with Ø100 mm cutter for U, J and V preps on 9–100 mm plate, Ra 3.2–6.3 finish.
U and J grooves need less filler metal than a V on thick plate, but they are hard to make with a torch. The GMMA-100U mills them directly with a Ø100 mm cutter, alongside standard V, Y, K and X preps, on plate from 9 to 100 mm thick.
Values for the standard configuration. Custom versions may differ; confirm with your quotation.
| Power supply | AC 380 V, 50 Hz, 3-phase |
|---|---|
| Total power | 6,300 W |
| Feed speed | 0–1500 mm/min |
| Bevel angle | 0–45° |
| Plate thickness | 9–100 mm |
| Single bevel width | 0–30 mm |
| Max. bevel width | 0–80 mm (50 mm at 45°) |
| Cutter diameter | 100 mm |
| Surface finish | Ra 3.2–6.3 |
| Bevel types | V, Y, K, X, J, U, 0° |
| Weight | 400 kg |
| Warranty | 1 year |
See it in use: Heavy-plate U and J grooves for pressure vessel shells.
Range, power, warranty and shipping.
Milling head with Ø100 mm cutter for U, J and V preps on 9–100 mm plate, Ra 3.2–6.3 finish. Typical applications: thick-wall pressure vessels, nuclear and power components, heavy fabrication.
The GMMA-100U covers 9–100 mm.
V, Y, K, X, J, U, 0° preparations. Send us your joint drawing and we will confirm the tooling.
1 year warranty. Every machine is run and inspected before shipment; a test report and an outgoing-inspection video are provided with the order.
Standard configuration: AC 380 V, 50 Hz, 3-phase. Tell us your voltage, phase and frequency, or whether you need pneumatic drive, when you request a quote and we will confirm the available configuration.
Machines are packed in export wooden or plywood cases; portable tools ship in fitted carry cases inside the export carton. We ship by sea, air or express from Shanghai and provide the commercial invoice, packing list and certificate of origin.




Tell us the material, size and bevel or face you need, and your power supply. We reply within one working day.